PLANNING THE DYEING OF LOCAL CLOTH PRODUCTION CASE STUDY OF BAN CHIANG LOCAL CLOTH COMMUNITY ENTERPRISE

Authors

  • Surapong Intarapak Suan Sunandha Rajabhat University
  • Phirayu Seanbudda Suan Sunandha Rajabhat University
  • Srayut Kuanmuang Suan Sunandha Rajabhat University

Keywords:

Production Planning, Fabric Dyeing, Community Enterprise Group

Abstract

This research has the objective. namely, to improve the production process of local cloth. Ban Chiang Local Cloth Community Enterprise Due to not being able to deliver the product on time. and to plan the production of the dyeing process Ban Chiang Local Cloth Community Enterprise Group according to customer schedule. By determining methods for planning production for efficiency in community enterprise groups. By asking questions. Observe the various behaviors of employees while working. Recorded information and interviewed practitioners according to the 4 M. principles in conducting the study. Analysis. And improvement. Production process. This research provides advice. Improve. And correct. Research results. 1) Add a drying rack. Quantity: 8 sets. Increases time spent in the sun. Makes it dry faster. When there are more racks, clothes drying will not be overlapped. Makes it dry faster. Production times are as follows. Before improving, measure the distance of movement of raw materials. 10 meters. and took a total of 79.5 hours. After improving the measurement of the distance of moving materials by 10 meters. and took a total of 60 minutes. The moving distance was the same. and the time spent is reduced by equal to. 79.5-60 = 19.5 hours. Calculated as a percentage reduction equal to. 24.52%. 2) Planning implementation goals. Production capacity is 5000 pieces/Week. In step 4, take the finished dyed yarn and hang it in the sun to dry completely. From adding a clothes rack. Quantity: 8 sets. Spend less time drying clothes faster. Can plan Production capacity 2 Lot/Week and 1 Lot = 2500 piece. After adjusting the number of backorders in Order quarter 3 (2023) of 0 pieces. New Planning Back Order is equal to a percentage reduction of 0% with stock. items: 7700 pieces.

Downloads

Published

2025-02-28